Are group has slowly day by
day been producing a diary of planning for are short film discussing and
looking into finance, personnel needed and available, rescores needed and
available, talking about and preparing budget, contacting personnel, book resources,
preparing schedule, looking into the health and safety regulations, identifying
legal implications and identifying risks to our project.
Finance:
Location; we have decided to use a local bus stop as the main
setting for our short film, this is a walk away from our main college site,
this means no travel expense is needed to get to this location as its a five
minute walk away. To get to our main site, which is Acland Burghley School, the
people in our group take the bus because we are 16 and still in full time
education our bus travel is free.
Lunch; Near our
site location and filming location there are many small cafe and chip shops
where we can get our lunch when filming. The most we spend at a lunch time
round the shops is around four pound each we all own our own pocket money so
that will come out of our individual pockets.
Actors; because we are creating a short film in small groups
we are using the people in our group to star and be extras in this short film.
This means we do not have to pay for any of the actors in are film because they
are doing it out of there own will to create an effective and enjoyable short
film. We are also making sure that when we are at our location that the members
of the public are very aware that we are filming in this public area and are
told by our group that filming is taking place this is so we don’t have to pay
or get any complaints that we are filming someone without there permission.
Props and wardrobe; when filming props are used; a phone and headphones are
used as well as a school bag. Different members of the group own all these
props this is so no props have to be bought just for the short film. Costumes
are also owned by different people in the groups like coats, jumpers, scalfs,
t-shirts again this is also so we don’t have to buy costume just for the film.
When having complication in finding wardrobe for the characters the drama
departments are happy to lend costumes room their costume box, which will not
cost the group anything.
So all together the money
that the group will spend is for lunch spending no more then five pound on
lunch which will come out of there own pocket.
Personnel needed and
available:
Crew; to create a film with little complications a crew is
needed. For our short film we have decided that we would need a;
-Director (Amelia)
-Producer (Meltem)
-Wardrobe and make up
artists (Doriana)
-Editor (Joey)
Because we are a small
group making a small class project a big crew does not need to be formed.
Because it’s a class assignment the availability of the crew is high due to the
group taking responsibility for each role. The only complication of this is if
one member of the group is absent from a period of filming time and the role is
left or taking up by another member. Again because we are a small group main
roles like location manger, casting director and other important roles to help
create a film is taking up by the whole group by sharing ideas and finding
locations and officering to be a star in the film.
Cast; Another big personnel that is needed is the cast
depending on what genre your film is and how the script is laid out is
different cast members. For our short film we have decided that we wanted
-Main character (Boy)
(Joey)
-Love interest (Girl)
(Amelia)
-Love interests
partner (Girl) (Molly)
These are all members of
our group playing the characters we have created. A complication with this is
that if one of the members from our cast is absent then there could be a hold
up in our filmmaking schedule and no continuity if we change the cast member
through the middle of filming.
Rescores needed and
available:
All movies need facilities
for them to produce their film, from setting to camera lighting and sound
booths. Are group decided to have out only setting to be at the bus stop that
was near our collage, due to us being young film makers still in full tine
education paying to use this location was not needed for the project we was
doing. We avoided ant type of advertising the transport for London but doing
research of paying for a location we came across a website which gives you
locations that could be relevant to your footage and the location in your mind.
http://www.totalfilm.com/features/25-london-movie-locations this website gives
you 25 different locations around London which could be helpful with your
production. There is also a website that sells different sets like apartments
for filming to take place.
Because we are studying
media at out collage we have different facilities Available like cameras, which
is a canon (Eos 600D), sound booths, artificial lighting, reflectors, and other equipment,
needed to make and film our planned ideas. Because we have all the facilities
we need we do not need to hire or borrow and equipment, which means no spending
and easier access the equipment. There are only a certain amount of cameras for
are media class which we have to share during out set times. There are 5
cameras, 2 sound booths and one set of arterial lights. This could be
complicated due to there being so little facilities for a big class not every
can film at the same time.
Preparing budget:
Because we planned and
worked out what things we didn’t have to pay for and what things we did we
decided to focus on out own budgets for lunch and hot drinks during filming
time. Most of us bring around three pound or more during filming time. We all
do not need to pay for our travel to our collage or are travel to the bus stop.
Are equipment does not need to be paid for (Apart from if we damage any of the
equipment which can not be used by another person the amount of the camera the
school bought it for you personally need to pay for the fixing of the equipment
or the whole replacement of the equipment). The location does not need to be
paid for nor does the actors and post and pre production cast due to being our
media group.
Contact personnel:
Because we are young
filmmakers we work together to produce this footage, we picked our group due to
friendship and the people that we were sitting with in our media session. if in
one session one of our members failed to show up we all have a contact number
for each other is we do not have a personal phone on us there are school phones
that we can use but also if we do not know or do not have there contact number
on us then the school has everyone in out media groups home and mobile contact
number that can be in use with permission from our collage teacher.
Book resources:
We do need to book cameras
for our footage. Cameras during our media session we do not need to book our
equipment due to it being our time to use the cameras if we want to use them
outside our session then we have to get in contact with our media teacher via
email, text, phone call pr in person to schedule a suitable time for the
cameras to be booked for our footage.
Prepare schedule:
Because our cast and crew
have different lessons thought out collage day we have only our media sessions
and our free periods as well as well as our after school and before school
times. We thought it would be better for our group if we stayed and did our
footage in our media session so we are all in the same place and we do not need
to go and book for the equipment we need for our footage. So we created a
schedule to keep originated and to keep to a deadline to stop filming our
footage. We decided to film day 1 scene 1 on the 15 of November at 9:30 and day
2 scenes 2 at 10:40. On the 18 of November we decided to film day 3 at 14:05 on
the 19th day 4 at 9:00 and on the 22 we filmed the last day, which was day 5 at
9:00, which was our deadline for shooting. We kept to this deadline.
Identify health and
safety implications:
When looking at our
locations we had to see and create a health and safety check to make sure the
setting we have chosen is safe for the cast and crew. We looked into it
thinking about what implications and hazards there would be where we are
filming. The things we thought would be implications, which could be Assault by
a person, cold environment, vehicle impact, stress, and litter. We looked more
into the location taking in account of the health and safety implication we
thought about the vehicle impact knowing that were filming in the pavement this
issue wont be the biggest issue to focus on, Cold environment are cast and crew
will be wearing suitable clothing for the weather. all the others where
looked into and seen as not a big issue for filming our footage.
Identify legal
implications:
When thinking of a song to
use in my production I had to find a song that would fit with my theme of the
film if I wanted a song from a famous person for example ‘Beyoncé’ I would have
to get in touch with one of her workers ask for permission to use one of her
songs or look into different websites that protect the music rights of people in the UK. An example of a website is 'PRS for music' which charges you or your company to use the music that they have protected. This would properly cost our group a lot of money to use her song. We
would need to ask for permission due to copyright issues of the song. We
decided that we should find a song that is free with no copy right we looked up
different sights with free un copyrighted songs until we found a song we liked
and used it in our footage The song we picked was from a free music sight called 'Free stockmusic' where we found our acoustic theme track. If we wanted to show our project in a cinema for example we would have to get a certificate that shows what the project is. For example rating it (U,PG,15) witch is given to the company of the production by the BBFC making it acceptable for the movie to be shown in places like film festivals and in cinema. Showing to an audience the suitable age for and audience to watch this project.
Identify risk to
project:
There are many different
ways are project could fail. First the weather could be to horrific to film
outside which could not be safe to work in of to foggy to see the events
happening. One of our members could not be coming in to one of the media
sessions so we have to hold off a day of filming which would put us behind on
filming. Something bad could happen to the cast or crew whilst filming which
could stop the whole project, we cannot find the right sound track without copy
right for our piece. Whilst filming we find that our story doesn’t make scene
or is too ambitious for us to film. There are no cameras in our sessions due to
important use for the school or them being stolen or damaged from a previous
group which will hold back our filming time and many more that could happen
without planning and carefully analyzing each factor of the pre production
stage thought the filming and post production stage.
No comments:
Post a Comment